Westrec Marinas’ New Haulover Marine Center

June 28, 2016

508-Rack Hurricane-Ready Dry Storage with Re-Designed Park, New Office, Retail Store and Bath House  

Westrec Marinas is pleased to announce the development of the new Haulover Marine Center, is well underway.   Located on the Intracoastal Waterway at Bakers-Haulover Inlet in North Miami Beach, Florida and nestled between Sunny Isles and Bal Harbor, the new building will be opposite the existing open dry storage rack system.   Following extensive negotiations with Miami-Dade County Parks and Recreation Department, all permits were issued and construction commenced in July 2014 with a completion date Grand Opening scheduled for the spring of 2016.

The most popular inland sandbar and one of the nicest beaches inSouth Florida  lie adjacent to the   site of the new Haulover Marine Center.  Westrec leases both the Marine Center on the north end of the Park where the new building will be located and Haulover Point which houses a retail store and fuel dock  at the southernmost end.

The appeal of the area for boaters and Westrec alike is an all-amenities approach enabling easy access to the water in an enviroment welcoming to water lovers whether visiting the park by water or land.

Haulover Marine Center is less than one mile from Baker’s Haulover Inlet and provides quick and easy ocean access. Between both, a boater’s ideal all-purpose location is represented with retail stores, a restaurant, fully stock extensive bait and tackle, a gas and diesel fuel dock, a marine service department, restrooms and a sanitary pump out.

To enhance and modernize Haulover Marine Center’s existing facilities while adding nearly double the dry storage, Westrec Marinas has successfully negotiated leading edge design, engineering and construction of the following improvements:

  • 508-rack fully enclosed dry storage building
  • A new marine center rated to withstand a Category 5 hurricane. Prime materials, such as galvanized steel, will be used throughout
  • An innovative elevator lift system will be used for launching and retrieving vessels
  • The dry storage building is being designed specifically to hold the larger multi-outboard engine boats that are popular in today’s marketplace.
  •  The new dry storage building will be five racks high, accommodating those vessels up to 50’ in length overall
  • A new parking area will be constructed to provide adequate parking for marina tenants and beach goers alike
  • Other components include a new office, retail store, and bath house
  • As part of the project, Westrec will remodel the existing Haulover Point retail store and fuel dock

To kick off the project and to indicate its excitement in developing this important boater’s mecca, Westrec is offering  a number of preopening  specials to those looking to secure a space for their boat and be among the first to be accommodated  when the new building is open in the spring of 2016.

News arrow
10/25Yacht Haven Park and Marina $26 Million Two Phase Renovation Plan
11/18Hall of Fame Marina thanks hardworking health care community
6/19Hall of Fame Marina Salutes Dive4Vets during National Marina Days
In a telephone survey conducted by HarGroup Replica Watches Management Hublot Classic Fusion Replica UK Consultants of 387 residents, more than 40 per cent (115 people) said they would be very likely to Replica Watches use this service. Market of potential Rolex watches customers recording over 1.8 million users and over $10 million in its last fiscal year.. PRESIDENT COMMENTS ON JP MORGAN CHASE(AP) President Barack Obama says JPMorgan Chase big loss of $2 billion in highrisk trading demonstrates the need for rules that Congress passed two years ago. Krishan Agarwal starter has recently appeared 604th in online retailers Replica Watches list by a leading internet magazine Replica Watches.